Faplac Alto Paraná

Industrial plant for particle boards. Zárate industrial park.
The project for the integrated engineering of the industrial plant is currently underway, aiming to optimize the fire protection systems, update and modernize them according to Vernassa’s proposed quality standards and in compliance with NFPA regulations.

Parque industrial de zárate

45 días de duración.

Sector to protect:

New warehouse building for spare parts and supplies

Assembly

A control and alarm station was installed for the automatic sprinkler system, along with an external hydrant system independent of the previous one. Concrete bases were built to support the piping.